• HOME
  • ABOUT
  • PROJECT
  • CONTACT
© Copyright © 2011. Neanthes Eco-consultant Limited all rights reserved

  • 2012 – Environmental Impact Assessment for Express Rail Link (XRL) 

    Conducted ecological benthic survey to investigate the potential impacts of the dredging works at Tsing Chau Wan barging point for the XRL infrastructural project.
  • Back